Stormwater Management

This page houses information about the Village of Archbold's stormwater management regulations, practices, and projects. You can also find stormwater calculation worksheets at the bottom of the page. 

PUBLIC NOTICE | Project 4-24

The Village of Archbold is constructing an Agricultural Runoff Treatment System (ARTS) Wetland on the Reservoir Property at Clyde's Way and East Lutz Road.

Please review the flyer here for information regarding Project 4-24!

Village of Archbold Stormwater Regulations

Stormwater Title Page
Image Description:
Cover Page of the Village of Archbold Stormwater Regulations, adopted March 20, 2023.

The Village of Archbold Stormwater Regulations establishes the minimum requirements for stormwater management using Best Management Practices (BMPs) to minimize the impact on local waterways and reduce localized flooding due to stormwater runoff caused by earth-disturbing activities, subsurface drainage, and land use changes.

Click on the image above to view the Village Stormwater Regulations!

Stormwater Detention Workbook

Provided below is an interactive Excel workbook that can assist you in making computations for storm sewers and stormwater detention design. Please reach out to our Engineering Department if you have questions about how to use these worksheets or to confirm your results!
storm detention

Image Description: Rainfall Frequency calculation sheet taken from the Stormwater Detention Workbook.

Click on the image above to download the Stormwater Detention Workbook!

Note: Once you download the workbook, make sure to click "enable editing" at the top of the Excel sheet so that you can fill the worksheet with your information.
Study Title Page

Image Description: Cover page taken from the Village of Archbold Stormwater Infrastructure Evaluation.

Click on the image above to download the 2023 Stormwater Infrastructure Evaluation!